Monday, August 22, 2011

How much energy we consume?


  • Steel Foundary:- 1.6 Lakh units /week.

  • Workshop :- 1.5 Lakh units/week.

  • Town Supply:- 5.5 Lakh units/week.

  • Admin and W/O :- 25 thousand units/week.

  • Water supply :- 90 thousand units/week.

Monday, August 8, 2011

Refrigeration Air Conditioners in CLW

The workload is as follows:-



  • Shop plant 42.5 T

  • EDP plant 55 T

  • Split AC 140 nos

  • Window AC 340 nos

  • Water Cooler 90 nos.

  • Fridge 60 nos.

  • RMPU GM Saloon

Sunday, August 7, 2011

What to check out in Centrifugal Pumps?


  • Apart from daily visual inspections, Fresh Gland Packing is checked monthly. If leakage is found from gland, same is required to be tightened.

  • Coupling alignment and integrity is to be checked monthly .

  • Tightness of foundation and "hold down bolts" is to be checked every 6 months.

  • Both DE and NDE side bearing greasing and coupling greasing is to be done in 6 months.

  • Shaft, sleeve, short sleeve, neck ring and impeller are to be checked after openeing top cover of pump every year.

  • Every year running clearance of impeller is to be checked.

  • Non -Return-Valve is to be checked every 6 months.

  • Packing and greasing of sluice valve is to be carried out every 6 months.

Tuesday, August 2, 2011

Filter House CLW

Water comes from Sidhabari pump house travelling through 12 KM pipelines. There are 13 centrifugal pumps ( 4 pumps are 189 cubic m/hr, 6 pumps are 225 cubic m/hr, and 3 are 227.3 cubic m /hr ). All these 75 kw pumps are 60 m head with motor efficiencies 92% and 1460 rpm.

Monday, August 1, 2011

Sewerage Treatment Plant























CLW has a huge sewerage treatment plant commissioned in 1951. It has two high capacity compressors.