Timer controlled street light

To control 3500 street lights, we have provided some timers.






Hill and Hospital Area( 900 quarters)




There are 17 street light feeders.




  • TS-14 ( 8 feeders) suplies to 110 street lights.




  • TS-16 ( 1 Feeder) supplies to 120 street lights.




  • TS-26 ( 2 feeders) supplies to 120 street lights.




  • TS-26 A ( 6 feeders) supplies to 80 street lights.This is yet to be fitted with timer.




SP N & F Area ( 3333 quarters )





This area has 10 street light feeders:-









  • TS- 20 supplies to 256 street jights.




  • TS- 21 supplies to 105 street lights.




  • TS-24 supplies to 103 street lights.




  • TS-25 supplies to 105 street lights.




  • TS-32 supplies to 67 street lights.




  • TS-3 supplies to 135 street lights. This is the only TS that has 2 feeders. Rest all TS have only sinle street light feeder.




  • TS-3A supplies to 62 street lights.




  • TS-33 supplies to 69 street lights.




  • TS-35 supplies to 33 street lights.



AML AREA ( 4263 quarters )




This are has 14 street light feeders.





  • TS-7



  • TS-7A



  • TS-8



  • TS-9



  • TS-10A



  • TS-10



  • TS-11



  • TS-11A


  • TS-13 :- 2 street light feeders.


  • TS-27 :- 1 street light feeder.


  • TS-27A:- 1 street light feeder.



SP E & W Area ( 800 quarters )

There are 36 street light feeders.






  • TS-18



  • TS-19a



  • TS-19



  • TS-22



  • TS-22A



In addition to above, street lights on 25 poles of the section from B/Ghat to NCC camp are supplied from Treatment plant of this area.


Tuesday, July 26, 2011

Sidhabari Pump House

Sidhabari is the pumps Damodar water to CLW. The entrance to jetty as shown above.

The panel inside

The control cable box.

The line that is used in case water level falls.

Pump #2 that is under repair.

The panel inside

Pumps



The transformer

Feeder circuit breakers

The substation room

Main Substation


  • Transformer earthing with ACSR conductor needs to be replaced with copper/MS .

  • Earth pits cover are required.

  • Earth Mesh diagaram is needed.

  • Neutral link needs to be monitored for being adequate or open/close.

  • Silica gel needs to be made stock item.

  • Capacitor banks and reactors needed to be kept healthy.

  • One 33 kv/ 25 kv power transformer for traction is lying spare.

  • 11 KV lines running over diesel tanks need to be removed.

CPH Control Room


  • Some point annunciators are defective.

  • The electromagnetic type protective relays need to be testsed for settings, or may be need replacement with numeric type relays.

  • Some spare cables need connection with the switchgear.

  • Cables of feeder # 22 and feeder # 17 need rectification.

  • 110 V DC battery room which caters to 32 HT panels should be kept in good fettle.

  • HT control room wiring needs to be tightened.

  • Two 415 V Sirens are run daily and recird needs to be kept.

  • JE and SBA who man the control room should record closing of circuit breaker.

  • Fault segregation chart needs to be prepared.

Substations inside workshop

There are 24 substations( 11 KV/ 440 V) inside the workshop in CLW.


  • 6 are in mail assembly ( A,A1,B,NEW,C, C1)

  • 7 are in ELP ( L,K,N,P,TDK Test Plant,Area Test Plant and T3)

  • 3 are in HMS ( E , G, G1)

  • 2 are in shop 19 ( M, T2)

  • 2 are in SFS ( H1,H2)

  • 1 in Paint Shop .

  • 1 in Tm coil shop ( VP1)

  • 1 in LMS (D)

Transformers are 1000 KVA and 750 KVA of various makes ( Voltamp, AREVA, Surya ). The LT side line current varies from 400 A to 1000 A.

1750 KW DG Sets in CLW




  • CLW has 6 nos 1750 KW DG sets for emergency power supply. The power packs are provided with EGB - 13 P type engine governor. These governors have been suggested to be replaced by PG type EM governor ( such as that of M/S Woodward).



  • DG 4 in CPH ( !987) is to be condenmed. CEE has lready approved. Survey could not be finalised for want of copper content.



  • DG 5 ( 1995 ) in CPH is shut down since 2004 for want a pedestal bearing ( BHEL ) of AVR with brush and separate excitation.


  • DG-2 (1978) is shut down since last 1 month due to 11 KV cable fault.


  • Recently Jamalpur workshop has given quotation for IOH ( M-48) and POH (M-96).

Monday, July 25, 2011

DVC Electricity Bill


  • Maximum Demand:- 11 MVA

  • Capacity Charge:- @ 106.96 paise per unit.

  • Energy Charge :- @ 86.26 Paise per unit.

  • Fuel Charge :- @ 104.08 paise per unit.

  • E. Duty:- 15 %

Sunday, July 24, 2011

Some high cost developmental options ( payback> 24 months) for Energy Efficiency


  • To install VFDs in all AHU motors to get speed and flow as per cooling requirement.


  • To overhaul bowl assembly, impellers thoroughly for less efficient Sidhabari pump#2 for achieving the desined efficiency of 75 % . ( Done?)


  • To install contact type on-line flow meter on supply lines of Sidhabari pumps.( Tender Opened ?)


  • To provide electronic ballasts ( 60 % conventional replaced).


  • To provide occupancy sensors.


  • To replace 90 W ceiling fans with EE 60 W fans.