- Steel Foundary:- 1.6 Lakh units /week.
- Workshop :- 1.5 Lakh units/week.
- Town Supply:- 5.5 Lakh units/week.
- Admin and W/O :- 25 thousand units/week.
- Water supply :- 90 thousand units/week.
33 KV power supply is taken at MSS from DVC and fed to main workshop , TM, Steel Foundary, Township and Water Supply through one 12 MVA transformer, three 10 MVA transformer and one 6 MVA transformer.PF is maintained at 0.94. There are 42 outdoor type and 21 indoor type ( 11/0.4) sub stations.One 3.3 KV Sidhabari substation serves pump house. यह ब्लॉग चित्तरंजन के पावर सप्लाई सिस्टम और तकनीकी बारीकियों के बारे में चर्चा का माध्यम है.