- Some point annunciators are defective.
- The electromagnetic type protective relays need to be testsed for settings, or may be need replacement with numeric type relays.
- Some spare cables need connection with the switchgear.
- Cables of feeder # 22 and feeder # 17 need rectification.
- 110 V DC battery room which caters to 32 HT panels should be kept in good fettle.
- HT control room wiring needs to be tightened.
- Two 415 V Sirens are run daily and recird needs to be kept.
- JE and SBA who man the control room should record closing of circuit breaker.
- Fault segregation chart needs to be prepared.
33 KV power supply is taken at MSS from DVC and fed to main workshop , TM, Steel Foundary, Township and Water Supply through one 12 MVA transformer, three 10 MVA transformer and one 6 MVA transformer.PF is maintained at 0.94. There are 42 outdoor type and 21 indoor type ( 11/0.4) sub stations.One 3.3 KV Sidhabari substation serves pump house. यह ब्लॉग चित्तरंजन के पावर सप्लाई सिस्टम और तकनीकी बारीकियों के बारे में चर्चा का माध्यम है.