Tuesday, July 26, 2011

Main Substation


  • Transformer earthing with ACSR conductor needs to be replaced with copper/MS .

  • Earth pits cover are required.

  • Earth Mesh diagaram is needed.

  • Neutral link needs to be monitored for being adequate or open/close.

  • Silica gel needs to be made stock item.

  • Capacitor banks and reactors needed to be kept healthy.

  • One 33 kv/ 25 kv power transformer for traction is lying spare.

  • 11 KV lines running over diesel tanks need to be removed.