Tuesday, July 26, 2011

Substations inside workshop

There are 24 substations( 11 KV/ 440 V) inside the workshop in CLW.


  • 6 are in mail assembly ( A,A1,B,NEW,C, C1)

  • 7 are in ELP ( L,K,N,P,TDK Test Plant,Area Test Plant and T3)

  • 3 are in HMS ( E , G, G1)

  • 2 are in shop 19 ( M, T2)

  • 2 are in SFS ( H1,H2)

  • 1 in Paint Shop .

  • 1 in Tm coil shop ( VP1)

  • 1 in LMS (D)

Transformers are 1000 KVA and 750 KVA of various makes ( Voltamp, AREVA, Surya ). The LT side line current varies from 400 A to 1000 A.